Name
Gran Canaria pavilion
Weight
2500 Tn
Category
Engineering
Project description
The Multipurpose Hall of las Palmas de Gran Canaria, where several meetings Mundobasquet 2014, will be played has been one of the major projects in which has recently intervened industries metal ANRO and has done building, transporting and assembling large parts of the structure of the Pavilion, a project budgeted at 67 million euros and will be finalized for the celebration of several meetings of the 2014 Mundobasquet , Las Palmas is one of their headquarters in Spain.
For ANRO, this great project that was selected by the UTE: COMSASANDO CONSTRUCTIONS-SATOCAN and PRECONTE, has been a challenge very important, since the large parts, manufactured at its facilities in Tomelloso (Ciudad Real), were transferred to Las Palmas to be here assembled, according to the requirements of the joint Venture won the contract for this pavilion multi-purpose, which will have a capacity of 11,000 seats and up to 20,000 people at non-sporting events. The magnitude of the project, in which ANRO has employed more than 2,500 tons of steel in the structures of the deck and steps, it gives idea, for example, that the length of louvres which ANRO has manufactured and assembled on the deck of the Pavilion, they have 90 meters in length and a height of 7 meter
Adress of work: Las Palmas de Gran Canaria